Hybrid solar basics
What is a hybrid solar system?
A hybrid solar system combines solar panels, a hybrid inverter, battery storage and a grid connection. Solar powers your loads during the day, surplus energy charges the batteries, and the grid tops up whenever solar and batteries are not enough. When the grid fails, the inverter can switch selected loads to battery backup.
Is a hybrid solar system the same as an on-grid system?
No. A standard on-grid system has no batteries and shuts down during a power cut for safety. A hybrid system adds batteries and an inverter that can keep chosen circuits running when the grid is down, while still working with the grid the rest of the time.
Will my whole building run during a power cut?
Not automatically. What stays on, and for how long, depends on battery capacity, inverter rating and which circuits are wired to the backup side. We list your essential loads first, such as lights, fans, Wi-Fi, a refrigerator or a borewell pump, and size the backup for them.
What are the main parts of a hybrid solar system?
Solar panels, a hybrid inverter, a battery bank, mounting structures, DC and AC protection boxes, cables, earthing and lightning protection, and a monitoring device.
Can I go completely off-grid with a hybrid system?
Hybrid systems are designed to work with the grid. Going fully off-grid needs a much larger battery bank and solar array to cover cloudy days, which raises cost considerably.
Batteries and backup
How long do the batteries last?
Tubular lead-acid batteries typically last 3 to 5 years. Lithium iron phosphate (LiFePO4) batteries commonly last 8 to 12 years. Actual life depends on daily cycling, depth of discharge, temperature and maintenance.
Can I add a battery to my existing solar system?
Often, yes. Depending on your current inverter, we either add a compatible battery and hybrid inverter or retrofit an AC-coupled battery system. We check inverter compatibility, wiring and warranties before recommending an upgrade.
How long will my battery backup last?
Backup time equals usable battery energy divided by the power your backup loads draw. For example, about 4 kWh of usable storage can run 500 W of lights, fans and Wi-Fi for roughly 8 hours.
Do batteries need maintenance?
Lithium batteries are maintenance-free apart from periodic health checks. Tubular lead-acid batteries need water top-ups and terminal cleaning every few months.
Costs, savings and subsidy
How much can I save on electricity?
Savings depend on your tariff, how much solar energy you use directly, system size, shading and DISCOM rules on net metering. As a rough guide, each kW of panels produces about 3.5 to 4.5 units a day in most of India. Use our calculator for an indicative figure; your proposal will show a site-specific estimate.
Is there a subsidy for hybrid solar systems?
Homeowners installing a grid-connected rooftop system can apply for the central subsidy under PM Surya Ghar: Muft Bijli Yojana: ₹30,000 per kW for the first 2 kW and ₹18,000 for the 3rd kW, up to ₹78,000 per home. The solar portion of a hybrid system can qualify when it meets the scheme rules (DCR modules from the ALMM list, DISCOM approval and net metering). Batteries are not subsidised, and commercial or industrial projects are not covered. Some states add their own top-up, so we confirm the current amount for your DISCOM before you commit.
Is solar finance available?
Yes. Many banks and NBFCs offer solar loans, and residential rooftop loans are available at concessional rates under PM Surya Ghar. Our partner Credit Success can help you compare options.
Do I get money for the power I export?
Where your DISCOM allows net metering, exported units are offset against units you import. Rules, limits and settlement rates differ by state.
Installation and service
How much roof space do I need?
Plan for roughly 80 to 100 sq ft of shadow-free roof per kW of panels. Elevated structures can make use of terraces that have water tanks or other obstructions.
How long does installation take?
On-site work for a typical home takes 1 to 3 days once materials arrive. Larger commercial systems take longer. DISCOM approvals and net-meter installation can add a few weeks, depending on your electricity board.
Do you provide installation and maintenance?
Yes. We handle the site survey, design, supply, installation, commissioning, net-metering paperwork and after-sales service, including annual maintenance contracts (AMC). Tell us your location and we will confirm the service scope for your site.
Do I need approval from my electricity board?
Yes, for grid-connected and hybrid systems. The DISCOM approves the connection and installs a bi-directional net meter. We prepare and file the paperwork.